LicensedNSW Lic 489163C

Wollongong Roof Repairs
& Re-Roofing.

Leaking, Damaged or Due for a Replacement? Every Roofing Job, Big or Small. Fully licensed and locally based, we handle roof repairs through to full replacements right across Wollongong and the Illawarra. Upfront pricing, fast response, and work built to last.

Today*Same-day serviceFixedUpfront quotes24/7Phone bookingsNSWLicensed

*Same-day service subject to availability, safe access and weather. Bookings by phone any time.

On the Tools

Roofing Done Properly.

Repairs, inspections and re-roofs by the same licensed Illawarra crew.

Roofing team working on a roof repair and replacement job
Re-roof in progress
Roofer on a ladder assessing a damaged roof
Assessed from the roof, not the driveway
Roofing team performing an inspection on a roof
Written report with photos
Sound Familiar?

Which One's You?

Tell us what you're seeing and we'll tell you what it usually means, then give you a fixed quote before any work starts.

A wet patch on the ceiling

Water has usually been getting in for a while. Common sources are cracked tiles, lifted flashing or perished seals around a skylight or vent. We trace it to the source, not just the stain.

Cracked or slipped tiles

A few tiles can be replaced without touching the rest of the roof. Lots of them, or crumbling ridge pointing, points to a re-bed and re-point or a re-roof.

Rusting metal sheets or screws

Surface rust on fasteners is a maintenance job. Rust through the sheet, especially near the coast, means that sheet or run needs replacing.

Faded, chalky or lifting coating

The coating is at end of life. Depending on the sheet underneath it's either a re-roof or a case for watching and planning.

Buying or selling a home

A pre-purchase or pre-sale inspection with photos tells you exactly what's up there and what it will cost, before the contract does.

Roof is 30-plus years old

Age alone isn't a reason to re-roof, but a roof that old with repeat leaks usually costs more to keep patching than to replace.

Every Roof Type

Tile, Colorbond & Everything On Top.

We repair, inspect and replace the roof types found across the Illawarra, and we'll tell you honestly which one suits your home.

Concrete & Terracotta Tile

Tile replacement, re-bedding and re-pointing of ridges, valley replacement and full tile re-roofs on established brick-and-tile homes.

Colorbond & Zincalume

Sheet and fastener replacement, flashing repairs and new metal roofs, with coastal-grade finishes where the salt air demands it.

Inspections & Reports

Full roof and gutter condition reports with photos and priority repairs, for buying, selling, insurance or peace of mind.

Re-Roofs & Replacements

Surface and underlayments replaced on a sound frame, or the full system from the frame up where the structure has gone.

Weighing up tile versus Colorbond? Read our guide, or just ask us on the phone.

Talk Roofing Now · 1300 707 059
Full-Service Roofing

Roof Repairs Through to Full Replacements. Every Roofing Job Done Properly First Time.

Roof Leak Detection and Repair

Caught early, a roof leak is usually a straightforward fix. We track the leak back to its source and repair it properly, so you can stop worrying about the next downpour.

  • Targeted leak detection and source diagnosis
  • Cracked and broken tile replacement
  • Penetration, flashing and seal repairs
  • Emergency leak response, phone any time
Roofing team working on a roof repair and replacement job

Roof Inspections and Reports

If you're buying, selling, or just wondering what's going on up top, a full inspection gives you the picture. We assess the roof and provide a written report with photos and recommendations.

  • Full roof and gutter condition assessments
  • Pre-purchase and pre-sale inspections
  • Post-storm damage assessments for insurance
  • Written reports with photos and priority repairs
Roofer working on repairing sections of the roof

Re-Roofing

When repairs are no longer the smart fix, re-roofing replaces the surface and underlayments without touching the frame. We manage the full process, materials through to compliance.

  • Tile and Colorbond metal re-roofs
  • Replacement sarking, battens and underlayments
  • Full colour and profile selection
  • Compliant with current Australian standards
Roofer on a ladder assessing a damaged roof

Full Roof Replacements

Where the underlying timber or steel structure has gone, a full replacement starts from the frame up. We assess, scope and replace the entire system properly.

  • Complete strip-out and frame inspection
  • Replacement battens, sarking and roofing
  • Insulation and ventilation upgrades
  • Ideal alongside renovations and extensions
Roof plumbers working together to repair a damaged roof
Straight Answer

Repair It or Re-Roof?

We'll never quote you a new roof you don't need. Here's the rule of thumb our roofers actually use.

Repair makes sense if… Usually a short job

  • The leak traces to one tile, flashing or seal
  • The sheeting or tiles are mostly sound
  • Ridge pointing is the only thing failing
  • The roof has years of life left in the coating

Re-roof if… Fixed quote, 2 to 4 days typical

  • Leaks keep coming back in different places
  • Rust has gone through the sheets or tiles are crumbling
  • Sarking and battens have deteriorated
  • You're renovating or extending and want one roof system
Local Knowledge

Roofs in Wollongong & the Illawarra

The Illawarra's housing runs from original weatherboard and brick cottages on the northern beaches to post-war brick-and-tile across Fairy Meadow, Unanderra and Warrawong, and new Colorbond estates around Calderwood, Tullimbar and Shell Cove. Each needs a different approach.

Near the surf we recommend coastal-grade Colorbond; a standard grade within a few kilometres of the beach will not last as long, and the difference shows first in the gutters and flashings. On the older tile roofs, re-bedding and re-pointing keep a sound roof going for years before a re-roof is worth it.

Most single-storey re-roofs take two to four working days, weather permitting. We never strip more than we can re-cover before the day's forecast, and we cover the property properly between work days.

Materials We Work With

The Right Product for a Coastal Roof

Coastal-grade finishes near the surf, like-for-like matches on repairs, and a fixed quote before anything is ordered.

Fixed Quote. Nothing Hidden.

What's Included in a Re-Roof

  • Site assessment, measurements and a detailed written quote
  • Material, profile and colour selection with you
  • Strip-out of the old roof, sarking and battens, waste removed
  • New sarking and battens, new sheeting or tiles, custom-folded flashings
  • Gutters and downpipes checked, replaced if past their life
  • Site clean, walk-through sign-off, workmanship warranty in writing

No hourly rates, no surprises. You approve the exact price before we start.

Roof plumbers working together on a damaged roof
Walked with you before sign-off
Our Process

Simple and Stress-Free, From Start to Finish.

1

Call Us

Phone 1300 707 059 any time. We'll lock in a time that works for you.

2

Complete Assessment

One of our licensed roofers arrives on time, assesses the situation, and walks you through exactly what's needed.

3

A Clear Quote

No surprises, no pressure. We provide a fixed upfront quote before any work begins. Once you approve it, we get started.

4

Job Done, Guaranteed

We complete the work to a high standard, clean up after ourselves, and back it all with our workmanship warranty.

Frequently Asked Questions

Straight Answers From People Who Know Roofing.

How long does a typical re-roof take on a Wollongong home?

Most single-storey re-roofs are completed in two to four working days, weather dependent. Larger or more complex homes can take five to seven. We'll give you a clear timeframe with your quote.

What's the difference between a re-roof and a full roof replacement?

A re-roof replaces the surface and underlayments (sarking and battens) without touching the frame. A full replacement goes further and replaces the frame too, usually because timber or steel underneath has been compromised. Most jobs are re-roofs.

Tile or Colorbond?

It depends on how close you are to the coast, what the frame is rated for and the streetscape. Switching tile to metal is usually straightforward; metal to tile often needs frame work because tile is heavier. We'll walk the roof and recommend from there.

What happens if you find something once the old roof is off?

Rotten battens, perished sarking or water-damaged framing sometimes only show during strip-out. We photograph it, stop, walk you through what's needed and give you a written variation before continuing.

Do you do roof inspections on their own?

Yes. Pre-purchase, pre-sale, post-storm and general condition inspections, each with a written report, photos and priority repairs.

Can I stay home during a re-roof?

Yes, but it's noisy, ceiling dust can shift in older homes, and pets are best kept inside away from the work area. Solar panels usually need removing and reinstalling, which is coordinated separately.

Your Roof Works Hard for You. We'll Make Sure It Stays That Way.

Licensed Illawarra roofers, a fixed upfront quote before we start, and a workmanship warranty on every job.

*Same-day service subject to availability, safe access and weather. Bookings by phone any time.

Further reading

    Reviewed by the licensed roof plumbing team at Wollongong Guttering and Roofing, NSW Licence No. 489163C. Last updated .